Complete Engineering Solutions Under One Roof
Six integrated capabilities, one accountable partner — the full Concept to Completion chain.

Structural Design & Analysis
Our Structural Design Unit models, analyses, and details every structure in-house. Load paths, connections, and member sizing are engineered — not assumed — and verified against BS 5950 before anything is fabricated.
- STAAD.Pro & Prokon analysis
- BS 5950 compliance
- Connection design & detailing
- 3D conceptual design
Pre-Engineered Fabrication
Components are fabricated off-site under controlled conditions at our Wadduwa facility, with weather-protected quality control at every stage. Structures arrive on site ready to bolt together — faster, cleaner, and more precise than site-welded construction.
- Dedicated fabrication facility
- Weather-protected QC
- Dimensional precision
- Ready-to-erect components
Design & Build Turnkey
The signature Cemetco model. We take single-point responsibility from feasibility through handover, eliminating the gaps between designer, fabricator, and contractor where projects usually lose time and money.
- Single-point accountability
- Feasibility to handover
- No designer-contractor gaps
- Predictable cost & programme
Project Management
Every project runs on a managed programme with defined milestones, procurement schedules, and site coordination. You always know what is happening, what is next, and that delivery is on time.
- MS Project programme control
- Milestone reporting
- Procurement management
- Site coordination
Value Engineering
Before a design is frozen, we interrogate it: span arrangements, member selection, foundation loads, and buildability. The result is a structure that does exactly what you need — for less than a conventional design would cost.
- Design optimisation
- Material efficiency
- Buildability review
- Lifecycle cost focus
Council Approvals & Compliance
We prepare and manage council approvals and compliance documentation, so your project moves through the regulatory process without stalling your programme.
- Council approval drawings
- Compliance documentation
- Regulatory liaison
- BS 5950 certification
Why Pre-Engineered Steel
Designed to BS 5950. Fabricated off-site. Erected in weeks.
- P-01
Faster Delivery
Fabrication runs in parallel with site foundations — overall programmes shrink by months.
- P-02
Controlled Quality
Factory conditions and weather-protected QC produce tolerances site welding cannot match.
- P-03
Predictable Cost
Components are engineered and priced before fabrication — no on-site improvisation, no surprises.
- P-04
Minimal Site Disruption
Bolt-together erection means shorter site occupation and cleaner, safer works.
- P-05
Engineered Compliance
Every member and connection designed and verified to BS 5950.
- P-06
Built-In Expandability
Pre-engineered frames are designed for future bays, mezzanines, and extensions from day one.
Straight Answers
Start Your Project- What types of buildings does Cemetco construct?
Cemetco designs and builds factories, warehouses, commercial complexes, showrooms, vehicle sheds, aircraft hangars, tea factories, mezzanine decks, pavilions and gymnasiums, and factory renovations across Sri Lanka.
- What standard are Cemetco structures designed to?
All Cemetco structural designs comply with BS 5950, the British standard for the structural use of steelwork in building, engineered in-house using STAAD.Pro and Prokon.
- What does Concept to Completion mean?
One team carries your project through all five stages — concept, design, fabrication, erection, and handover — under a single contract with single-point accountability.
- Where does Cemetco fabricate its structures?
Components are fabricated off-site at Cemetco's dedicated fabrication facility in Wadduwa under weather-protected quality control, then erected on site by experienced crews.
- How much has Cemetco built?
Since 2016, Cemetco has delivered more than 2,000,000 sq.ft of ground coverage for over 200 corporate clients in Sri Lanka.